Muhammad Khurram

https://www.linkedin.com/in/engineermuhammadkhurram/

I am Muhammad Khurram having more than 15 years’ experience in diverse range of industries like FMCG, Automotive, Manufacturing & Textile. In-depth knowledge and working in Production Planning & Control, Cost reduction, effective resource utilization, Toyota Production System and Capacity enhancement. Confident that my reputation as a leader will allow me to deliver similar results for your company.

As a Lean Six Sigma Green Belt, have strong expertise on Lean Manufacturing and process accuracy. Proven ability to establish engineering systems to achieve efficient operations with an emphasis on manufacturing processes. Capable to define strategies that impact planning processes, organization, integration of resource management, control, industrial and safety. Utilize skill to apply within an organization for the implementation of results that contribute to high performance and growth of the business.

Here’s are some highlights of my achievements:

• Accomplished PKR 600 Million project, of new vehicle of Toyota “YARIS”-. Brazing furnace Modification, New Fin Forming machine installation and all others auxiliaries. (Project Duration - Jan 2018 to Mar 2019).

• Increase capacity utilization of Finishing Machines from 80 to 82% by Lean Six Sigma project - Saving US$ 1098/month

• Implementation of new idea of SURF EXCEL in PP bags by removing the corrugated boxes by Layout Changing, Method Engineering and Equipment’s selection - PKR 200 million saving / year.

• Reduced the Packing materials wastages from 2.5 % to 1.5%, using TPM Methodologies.

• Initiated one-piece flow on 242L Mat luggage – reduce the production lead time 50 %- and 50 %-man hour saving.

Muhammad Khurram

Email: leanconsultants4u@gmail.com

LinkedIn: https://www.linkedin.com/in/engineermuhammadkhurram/

+92 333 3621121